Clear the design review list from a critique, one comment per ticket
The list of corrections from a design critique, worked one comment at a time with a capture each.
The ticket
Fix one design review comment and capture the result.
Acceptance criteria
- The specific comment is addressed rather than approximated
- A before and after capture is attached
- The fix uses existing tokens and components
- The comment is resolved in the review thread
What lands as proof
A paired before and after capture, which lets the reviewer close the comment without reopening the branch.
Why teams defer it
- Design feedback arrives as a list in a comment thread, which is not a backlog anybody works from.
- Each item is small enough that batching feels efficient, and batches never get scheduled.
Questions
- What does the agent actually change?
- The ticket is scoped to one outcome: fix one design review comment and capture the result. Work that serves that outcome is in scope, and anything outside it is left for a separate ticket, so the pull request stays reviewable.
- How do I know the work is done?
- The pull request carries the evidence, not only the diff. Here that means before and after capture for each comment, so a reviewer can confirm the result without reproducing the work locally.
- How much oversight does this need?
- None is required before the run starts. Every claim this ticket makes can be checked by machine, so the agent works straight through and a person reviews the finished pull request like any other.